CSUMB Science Center Parking

Projects

Higher Education

CSUMB Science Center Parking

Description

Ifland Engineers is currently designing a new connector between parking lots at the Chapman Science Center and the adjacent Annex building on A Street.  With the University intending to close A Street to all but campus vehicles there is a need to provide parking lot users with access to 6th Avenue via the connector between existing lots.  Landscaping will be removed and a row of accessible parking spaces, loading zones and curb ramps provided at the Chapman Science Center.  New sidewalks, a crosswalk through the connector and curb ramps will facilitate pedestrian movements between buildings.  Construction is intended to begin in summer 2013 and be completed prior to the start of the 2013-14 school year.